LCD Digital Integrated temperature and humidity sensor with Rs485
Overview LCD Digital Integrated temperature and humidity sensor with Rs485 Product Parameters Company Information Applic;
Overview
Company InformationApplicationPackaging & ShippingFAQ
Basic Info.
Model NO. | FST100-2006A |
Measuring Medium | Soil Temperature Humidity |
IP Rating | IP65 |
Certification | CE |
Customized | Customized |
Amplifier Type | Multi Function |
Electrical Connections | Direct Lead |
Output | Analog SENSOR |
Sealing material | ABS engineering plastic |
Accuracy | ±0.2°C; ±2% or ±2% |
Maximum Power Consumption | 1.2W 0.4W |
Probe Diameter | 3mm |
Probe Length | 55mm |
Supply voltage | 6~24V DC |
Signal Output | 4~20mA RS485 Output (Modbus Protocol |
Transport Package | Standard Exporting Package |
Specification | stainless steel |
Trademark | Firstrate |
Origin | Changsha China |
HS Code | 9025800000 |
Production Capacity | 50000pieces/Month |
Product Description
LCD Digital Integrated temperature and humidity sensor with Rs485Product ParametersMeasurement range | -40~80°C |
Units of measurement | °C;%( m3/m3);mS/cm |
Temperature range | -30 ~ 70 ° C (can be customized 0 ~ 50 ° C or any other range) |
Water component | 0~100% (can choose 30%, 50% equal range or customize any range) |
Salt component | 0~20 mS/cm (can be customized 0~5mS/cm, 0~10mS/cm, etc.) |
Accuracy | ±0.2°C; ±2% (m3/m3) in the range of 0 to 50% (m3/m3); ±2% |
Resolution | 0.1 ° C; 0.1%, 0.001 mS / cm (1 μS / cm) |
Output signal | Rs485 (standard Modbus-RTU protocol, device default address: 01) |
Supply voltage | 6~24V DC |
Electrical connections | Direct lead |
Sealing material | ABS engineering plastic, epoxy resin |
Probe length | 55mm |
Probe diameter | 3mm |
Q: Are you manufacturer?
A: Yes, We are professional sensor manufacturer over 50 years! Our technical team has more than 20 engineers.
Q: Can you accept OEM service ?
A: Yes, we can put your company information and logo on our sensors.
Q: Can I be your distributor?
A: Yes, we are looking for distributors in oversea market.
Q: What is your lead time?
A: Normally 7-10days. For quantity above100pcs, need extra 3-5 working days.
You may also like
Send inquiry
Send now